Gold Member Since 2016
FAME TOP INDUSTRIAL LIMITED

PPR Clamp, PPR Pipe Clamp, Pipe Clamp manufacturer / supplier in China, offering PPR Pipe Clamp with Size 20mm-63mm, Hot Selling Pex/Pert Hose for Underfloor Heating, Plastic Tube for Hot and Cold Water and so on.

(/ )

Supplier Homepage Product 6).PPR Pipe Fitting PPR Pipe Clamp with Size 20mm-63mm

PPR Pipe Clamp with Size 20mm-63mm

FOB Price: Get Latest Price
Min. Order: 1,000 Pieces
Production Capacity: 6000000
Transport Package: Carton
Payment Terms: L/C, T/T, Western Union, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: FT10105
  • Structure: Vertical
  • Material: PP-R
  • Color: Green,White,Grey
  • Specification: 20mm-160mm
  • HS Code: 39174000
  • Connection: Welding
  • Flexible or Rigid: Rigid
  • Standard: Standard
  • Trademark: Fametop
  • Origin: China
Product Description
PPR Pipe Clamp With Size 20mm-63mm
Material: 100% Fresh Hyosung R200p;

Standard: DIN8077/8078;
Available Size:20mm,25mm,32mm,40mm,50mm;63mm;

Colors: Green / Gray / White / OEM
PPR Pipe Clamp with Size 20mm-63mm
For more than 30 years, Polypropylene Random Copolymer (PP-R) has been applied successfully
for hot and cold water applications in countries worldwide. The combination of properties such
as resistance to internal pressure, flexibility and impact have made PP-R the material of choice for
a safe and reliable long-lasting installations. No wonder that PP-R has been continuously replacing
traditional materials like copper and galvanized steel over the last decades.
PPR Pipe Clamp with Size 20mm-63mm

Benefits of PP-R:
• Service life according to tests performed under ISO 15874
• No contact corrosion when exposed to iron particles
• Taste and odor neutral
• Bacteriologically neutral
• Fast and easy installation
• Entire plastic systems available
• Good chemical resistance
• Low tendency to incrustation
PPR Pipe Clamp with Size 20mm-63mm
Fusion Instructions:
1,Mark the pipe

Mark the pipe for depth of penetration into the heater bush and fitting (see table). The mark must remain visible under heating and joining. 
2,Heat pipe and fitting

Push the pipe and the fitting into the heating tools. Once pipe and fitting are hot (after the correct time), pull out pipe and fitting very slowly.
3,Joint pipe and fitting

Joint the pipe & the fitting and push the pipe until it reaches the mark (that has to stay outside).
During the jointing time the welded part of pipe and fitting must remain fix, without any rotation.
During the cooling time, the welded part of pipe and fitting can be adjusted until cold. 
4,Fusion inspectoin

Fusion inspection. The outer fusion seam must be inspected. The seam must be present all around the pipe.
Send your message to this supplier
Avatar
Mr. David
Sales Director
*From:
To: Mr. David
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now