Zhejiang, China
Business Type:
Manufacturer/Factory, Trading Company
Registered Capital:
50000000 RMB
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001, ISO 14001
Average Lead Time:
Peak season lead time: one month
Off season lead time: within 15 workday
OEM/ODM Service
Sample Available

PPR Pipe, PP-R Pipe, PPR Fitting manufacturer / supplier in China, offering PPR Pipe/Fitting for Hot and Cold Water, PPR Fitting Under German 8077/8078 Standard (Reducing Socket), PPR Fitting Under German 8077/8078 Standard (Elblow 90) and so on.

Gold Member Since 2016

PPR Pipe/Fitting for Hot and Cold Water

Get Latest Price
Min. Order / Reference FOB Price
2,000 Meters US $0.25-0.38/ Meter
Port: Ningbo, China
Production Capacity: 9500000m
Payment Terms: L/C, T/T, Western Union, Paypal
Material: PPR
Hardness: Hard Tube
Type: Thermoplastic Pipe
Color: Transparent
Hollow: Hollow
Shape: Round

You Might Also Like

Loading...

Basic Info

Model NO.: 20mm-160mm
Usage: Water Supply Pipe
Length: 4m/Bar
Trademark: FameTop
Transport Package: Nylong Bag
Specification: 20mm-160mm
Origin: China
HS Code: 9172200

Product Description

PPR Pipe/Fitting For Hot And Cold Water;
Standard:DIN8077/8078;
Material: Hyosung R200p from Korea;
Max Working Temperature: 95C
Service Life: Over 50 Years;
Color:Green,Grey,White or as customerized;
CE Approved;
Packing:By PP Bag;
Length:3m/bar or 4m/bar;
PPR Pipe/Fitting for Hot and Cold Water
MAIN FEATURES:
Used for hot and cold water distribution systems,floor & central heating systems etc 
Smooth inside surface,lower flow noise,preventing dirt build-up inside the pipe
Long service life over 50 years
Heat preservation,and engergy-saving,heat conduct cofficient is 1/200 of that of metal pipe
Light in weight,easy to install,cost effective
PPR Pipe/Fitting for Hot and Cold Water

Fusion Instructions:
1,Mark the pipe

Mark the pipe for depth of penetration into the heater bush and fitting (see table). The mark must remain visible under heating and joining. 
2,Heat pipe and fitting

Push the pipe and the fitting into the heating tools. Once pipe and fitting are hot (after the correct time), pull out pipe and fitting very slowly.
3,Joint pipe and fitting

Joint the pipe & the fitting and push the pipe until it reaches the mark (that has to stay outside).
During the jointing time the welded part of pipe and fitting must remain fix, without any rotation.
During the cooling time, the welded part of pipe and fitting can be adjusted until cold. 
4,Fusion inspectoin

Fusion inspection. The outer fusion seam must be inspected. The seam must be present all around the pipe.
PPR Pipe/Fitting for Hot and Cold Water


 

Send your message to this supplier

*From:
*To:
avatar Mr. David
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now