• Plastic PPR Tube for Hot and Cold Water
  • Plastic PPR Tube for Hot and Cold Water
  • Plastic PPR Tube for Hot and Cold Water
  • Plastic PPR Tube for Hot and Cold Water
  • Plastic PPR Tube for Hot and Cold Water
  • Plastic PPR Tube for Hot and Cold Water

Plastic PPR Tube for Hot and Cold Water

Material: PPR
Hardness: Hard Tube
Type: Thermoplastic Pipe
Color: Transparent
Hollow: Hollow
Shape: Round
Samples:
US$ 0.1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
FT3001
Usage
Water Supply Pipe
Length
4m/Bar
Transport Package
Nylong Bag
Specification
20mm-160mm
Trademark
FameTop
Origin
China
HS Code
9172200
Production Capacity
9500000m

Product Description

PPR Tube For Hot And Cold Water;
Material: Hyosung R200p from Korea;
Max Working Temperature: 95C
Service Life: Over 50 Years;
CE Approved;
Plastic PPR Tube for Hot and Cold Water

MAIN FEATURES:
Used for hot and cold water distribution systems,floor & central heating systems etc 
Smooth inside surface,lower flow noise,preventing dirt build-up inside the pipe
Long service life over 50 years
Heat preservation,and engergy-saving,heat conduct cofficient is 1/200 of that of metal pipe
Light in weight,easy to install,cost effective

Plastic PPR Tube for Hot and Cold Water
Fusion Instructions:
1,Mark the pipe

Mark the pipe for depth of penetration into the heater bush and fitting (see table). The mark must remain visible under heating and joining. 
2,Heat pipe and fitting

Push the pipe and the fitting into the heating tools. Once pipe and fitting are hot (after the correct time), pull out pipe and fitting very slowly.
3,Joint pipe and fitting

Joint the pipe & the fitting and push the pipe until it reaches the mark (that has to stay outside).
During the jointing time the welded part of pipe and fitting must remain fix, without any rotation.
During the cooling time, the welded part of pipe and fitting can be adjusted until cold. 
4,Fusion inspectoin

Fusion inspection. The outer fusion seam must be inspected. The seam must be present all around the pipe.
Plastic PPR Tube for Hot and Cold Water


 





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now